bitunix

Proximity NUPL (Near-Price Cost Basis)

Vaihteluväli
  • 1M1M
  • 3M3M
  • 6M6M
  • 1Y1Y
  • ALLALL
Asteikko
  • LineaarinenLineaarinen
  • LogaritminenLogaritminen
Uusin
-0.00408
2026-10-28 · -0.004
1D-muutos
+9.03%
Edell. -0.00448
7D-muutos
-413.30%
Edell. -0.000794
30D-muutos
-458.80%
Edell. -0.000729
4Y-persentiili
29%
Koko historia 30%
Kaikkien aikojen huippu
0.483
2010-11-06 · -100.80%
1Y-vaihteluväli
-0.0454 – 0.0124
Alkaen 2010-07-18
Ladataan dataa…

Tietoa tästä mittarista

Mitä se mittaa

Proximity NUPL subtracts Proximity Realized Price from BTC price and divides the difference by BTC price. It expresses the gap to the proximity-weighted cost basis as a unitless fraction of spot, with positive values for a premium and negative values for a discount.

Näin luet sitä

Values above 0 show spot above the weighted cost, while values below 0 show spot below it; rising readings mean the relative gap is moving toward greater local profit. On March 4, 2024, the series reached about 0.1266, compared with a 2022 low near -0.0749 on May 11. These refer to the weighted cost measure, not the whole market's paper P/L.

Costs near spot receive more weight, and that mix changes as price moves. Broad-market NUPL sentiment zones therefore do not apply. The chart uses decimal fractions: 0.01 means 1%, while -0.01 means a negative gap equal to 1% of spot.

Tiheys
Päivittäin (UTC 00:00)
Omaisuuserä
BTC
Tyyppi
Yksittäinen arvo
Dataa alkaen
2010-07-18
Uusin data
2026-10-28
Datapisteet
5,947

UKK

How are Proximity NUPL and Proximity MVRV related?

Using the same price and weighted cost basis, Proximity NUPL equals 1 minus 1 divided by Proximity MVRV. A Proximity MVRV of 1 corresponds to Proximity NUPL of 0.

Does a negative Proximity NUPL mean all Bitcoin holders are in loss?

No. It means spot is below the proximity-weighted cost basis. It neither describes the average cost of all supply nor counts the share of holders in loss.

Is a Proximity NUPL reading of 0.1 the same as a 10% gain on cost?

No. The gap is divided by spot, not cost. A value of 0.1 puts weighted cost at 90% of spot, so spot is about 11.1% above that cost.